000%
AL MADEENASteel Works
Home 01 About 02 Services 03 Industries 04 Projects 05 Quality & Capabilities 06 Gallery 07 Insights 08 FAQ 09 Contact 10
+971 50 805 9757 almadeenasteelworks.llc@gmail.com Industrial Area, Mussafah, Abu Dhabi
Featured projects

Work delivered across the Emirates.

A selection of recent fabrication and installation packages — structural, stainless, architectural and industrial. Click any project to view it larger.

Central Production Kitchen — Mussafah, Abu Dhabi
Kitchen

Central Production Kitchen

Mussafah, Abu Dhabi · 2025

18 m Portal Frame Warehouse — ICAD, Abu Dhabi
Structural

18 m Portal Frame Warehouse

ICAD, Abu Dhabi · 2025

Hotel Atrium Balustrade — Corniche, Abu Dhabi
Architectural

Hotel Atrium Balustrade

Corniche, Abu Dhabi · 2024

Perforated Façade Screen — Al Reem Island
Architectural

Perforated Façade Screen

Al Reem Island · 2024

Food Plant Conveyor Frames — KIZAD, Abu Dhabi
Industrial

Food Plant Conveyor Frames

KIZAD, Abu Dhabi · 2024

Retail Shopfront Package — Abu Dhabi
Architectural

Retail Shopfront Package

Abu Dhabi · 2023

Storage Mezzanine & Stair — Mussafah, Abu Dhabi
Structural

Storage Mezzanine & Stair

Mussafah, Abu Dhabi · 2023

Hospital Equipment Batch — Abu Dhabi
Stainless

Hospital Equipment Batch

Abu Dhabi · 2023

Process Pipe Rack — Ruwais
Industrial

Process Pipe Rack

Ruwais · 2022

Villa Gates & Railings — Khalifa City
Architectural

Villa Gates & Railings

Khalifa City · 2022

Cold Store Door Frames — Mussafah, Abu Dhabi
Industrial

Cold Store Door Frames

Mussafah, Abu Dhabi · 2022

Car Park Shade Canopy — Abu Dhabi
Structural

Car Park Shade Canopy

Abu Dhabi · 2021

On site

Installation photography.

Crane lift and steel erection on site PhotoCrane lift and steel erection on site crane-lift-and-steel-erection-on-site.jpgErection
Installed kitchen handed over to the client PhotoInstalled kitchen handed over to the client installed-kitchen-handed-over-to-the-client.jpgKitchen handover
Site survey and setting out PhotoSite survey and setting out site-survey-and-setting-out.jpgSurvey
Fibre laser
16 mm
Mild steel cutting capacity
Press brake
3200 mm
Forming length at 135 tonne
Plate handling
40 mm
Maximum plate thickness
Coverage
7
Emirates delivered and installed
Client testimonials

What the clients said afterwards.

Al Madeena took our kitchen from drawing to commissioning in six weeks. The stainless work passed municipality inspection first time, which almost never happens.

Rashid Al HammadiOperations Director, Hospitality Group

We had a structural package that two other fabricators had already delayed. Their team re-detailed it, found a cheaper section and still hit the original date.

Marcus FernandesProject Manager, Main Contractor

The thing I value is that they tell you when something will not work. That saved us a very expensive mistake on the balustrade.

Sara KhouryInterior Design Consultant

Breakdown call-out on a Friday evening, welder on site within two hours, kitchen back in service before Saturday service. That is why we keep the contract.

Deepak MenonFacilities Manager, Restaurant Chain

Documentation was complete — WPS, welder certificates, mill certs, the lot. Our client's consultant approved the package without a single comment.

Ahmed SalehQA/QC Engineer, Contracting

Fifteen shopfronts, phased over four months, and not one of them held up the fit-out programme. Reliable is an underrated quality.

Priya NairRetail Delivery Manager
Emirates HospitalityICAD LogisticsGulf Food IndustriesReem ContractingCapital FacilitiesMussafah Cold StoresAl Bahr RetailDesert Rose HotelsKIZAD IndustrialCorniche CateringFalcon EngineeringMarina Fit-OutEmirates HospitalityICAD LogisticsGulf Food IndustriesReem ContractingCapital FacilitiesMussafah Cold StoresAl Bahr RetailDesert Rose HotelsKIZAD IndustrialCorniche CateringFalcon EngineeringMarina Fit-Out
Your project next

Tell us what you need built.

Drawings, a sketch or a photograph — whatever you have. We reply with an itemised quotation and an honest lead time.

Quick Quote on WhatsApp